13-06-2023 дата публикации
Номер: CN116255007A
Принадлежит:
The invention discloses a construction process for filling a gap at the top of a masonry wall. The construction process comprises the following steps: S1, preparing concrete; s2, manufacturing a limiting assembly; s3, gaps are cleaned; s4, a limiting assembly is installed in the gap; s5, pouring concrete; and S6, the concrete is trowelled. According to the construction technology for filling the top gap of the masonry wall, after the limiting assembly is installed in the gap, a closed grouting space can be formed in the gap, meanwhile, through the arrangement of a plurality of reinforcing ribs, after concrete slurry is poured into the grouting space, and when the concrete slurry is solidified, the grouting space is filled with the concrete slurry; the stability and strength of concrete in the grouting space can be effectively improved, then the situation that the concrete in gaps cracks after long-time use is effectively avoided, and meanwhile the waterproof performance of the limiting ...
Подробнее