06-06-2023 дата публикации
Номер: CN116219819A
Принадлежит:
The invention discloses a roadbed gravel pile construction method, and belongs to the technical field of foundation reinforcement engineering, the roadbed gravel pile construction method comprises the following steps: 1, original ground leveling treatment, 2, construction paying-off, 3, after mechanical equipment enters a site, pile foundation positioning after maintenance is completed, 4, pipe sinking is vibrated to a designed depth, and 5, pipe sinking is completed. The construction method comprises the following steps of (1) feeding, (2) pipe drawing, (3) reverse insertion, (4) pipe drawing, (5) feeding, (6) vibration pipe drawing and reverse insertion, (7) stone supplementary filling construction till top loading, (8) pile forming, repeating the step (3) and continuous construction, and (9) quality detection. According to the construction method of the roadbed gravel pile, the pile is formed through the pipe sinking method according to the technological parameters, the pipe drawing ...
Подробнее