04-07-2023 дата публикации
Номер: CN116384646A
Принадлежит:
The invention provides a joint water supply scheduling method, device and equipment for a water source project and a medium. The method comprises the following steps: constructing a corresponding water project joint scheduling model according to water source project information and water demand information; setting a target function, a penalty function, a constraint condition and an optimization variable corresponding to the water source project; the water source project comprises a plurality of reservoirs and a plurality of water diversion projects; setting a water source project; according to the optimization variable, the objective function, the penalty function and the constraint condition, solving and calculating the water engineering joint scheduling model to obtain an optimal joint water supply scheduling rule; and scheduling the reservoir group according to the optimal combined water supply scheduling rule. Water resources of the drainage basin and other water diversion projects ...
Подробнее