21-10-2015 дата публикации
Номер: CN0204716253U
Принадлежит:
... (B, ) the utility model discloses a circular major diameter diversion tunnel structure including passing through unfavorable geology circular major diameter diversion tunnel (5), is equipped with the preliminary bracing in diversion tunnel (5) 240 degrees within range peripheries on the upper portion, the preliminary bracing includes to be fixed at the suspended net of unfavorable geology working face reinforcing bar (2) through stock (4), and suspended net reinforcing bar (2) inboard is equipped with steel grating bow member (3), and it has concrete spraying layer (1) to spout on suspended net reinforcing bar (2) and steel grating bow member (3). The utility model discloses a to the technical process in the weak rock bad location in layer, not only reduced the degree of difficulty in the work progress, construction method practical and feasible, advanced reasonable, high -efficient, and improved the speed of construction to can effectively reduce construction cost, guarantee the safety ...
Подробнее