Номер: CN116535234A
Принадлежит:
The invention relates to the technical field of building materials, in particular to a bubble mixed light filling material and filling soil, according to the technical scheme, cement, water and a bubble agent are prepared into 1 m < 3 > of the filling material according to the proportion of 370-390 kg: 235 kg: 639-646 kg, and the filling material is used for filling a highway subgrade constructed in a narrow and small area, so that the construction efficiency is improved, and the construction cost is reduced. The problems that in the prior art, in a narrow section, roadbed filling quality is not easy to control, large equipment cannot be adopted, only a manual small tamping machine can be adopted for tamping, the working efficiency is low, the compaction degree is not easy to control, a concrete retaining wall needs to be arranged or a slope toe is enlarged to increase occupied space when common soil is adopted for filling, the more filling is, the higher the retaining wall construction ...