19-05-2010 дата публикации
Номер: CN0101709571A
Принадлежит:
The invention relates to a preparation method of a set of datum lines of a bridge steel box girder. The method comprises the following steps: firstly determining a set of datum lines as the preparation datum of the bridge steel box girder according to the structure of the bridge steel box girder, then dividing the bridge steel box girder into a plurality of preparation units according to the preparation datum, dividing the preparation units into a plurality of parts according to the datum, preparing the parts according to the preparation datum; after completing the preparation of the parts, assembling the preparation units according to the preparation datum, and assembling the whole bridge steel box girder with the preparation units according to the preparation datum. The invention adopts the unified preparation datum in the preparation process of the bridge steel box girder and the preparations of the parts of the bridge steel box girder so that the whole bridge steel box girder can be ...
Подробнее