09-11-2011 дата публикации
Номер: CN0102235006A
Принадлежит:
The invention relates to the technical field of building construction, in particular to a construction method for resisting artesian water in a bottom plate pit of a foundation pit. The invention discloses a construction method for bottom plate pit backfilling sand ballast. The method comprises the following steps of: a, after a bottom plate is cast and reaches the designed strength, clearing garbage and accumulated water in the bottom plate pit so that the bottom plate pit is clean and tidy; and b, backfilling the backfilling sand into the bottom plate pit till the surface of the foundation pit. According to the construction method for the bottom plate pit backfilling sand ballast, the integral weight of the bottom plate is increased by piling yellow sand in the bottom plate pit to resist the artesian water, so that the water pumping quantity of the artesian water is reduced, the influence on the surrounding environment is reduced, and risk on the surrounding environment is effectively ...
Подробнее