The invention discloses an intelligent high tower construction method which comprises the following steps that S1, construction of N sections of a high tower is completed on the ground, N is larger than or equal to 2, an N + 1 section steel shell is lifted and connected with the N section steel shell, and coarse positioning and accurate positioning are completed; an inner cavity multifunctional platform is installed, and steel bar butt joint is completed; an automatic welding system is started to complete seam welding; s21, a top enclosure system of the inner cavity multifunctional platform is folded, an automatic material distribution system is started to complete concrete pouring of N + 1 sections, and an intelligent vibration device completes vibration; s22, after the weld joints of the N + 1 section and the N section are detected, the automatic spraying system completes surface coating of a weld joint area; s31, the automatic material distributing system and the automatic spraying system ...
Подробнее