24-09-2008 дата публикации
Номер: CN0101270639A
Автор:
WANG DAOFU,
ZHOU ZONGQIANG,
XU YONGGAO,
ZHAO ZHENFENG,
FU GANGDAN,
LI XIANWEN,
ZHAO FENXIA,
GUI JIE,
DAOFU WANG,
ZONGQIANG ZHOU,
YONGGAO XU,
ZHENFENG ZHAO,
GANGDAN FU,
XIANWEN LI,
FENXIA ZHAO,
JIE GUI
Принадлежит:
An integrative method for a packer to pack off a multi-layer hydraulic sand-spraying perforation and pressure fracture is used in the multi-layer perforation and the pressure fracture of a well of well completion of a petroleum casing. A pipe column comprises an oil pipe, a safety joint, a hydraulic ejector, a K34 or a Y34 packer, a uniflow valve, a sieve vessel and an end cap, wherein, the lower layer of a hydraulic ejector position requires perforation depth. With the completion of perforation, the hydraulic sand-spraying fractures the lower layer by actively circulating the lower layer of the hydraulic sand-spraying perforation. When the hydraulic sand-spraying pressure fracture for the lower layer is completed, a reverse circulation surge tank is processed and the pipe column is leveled up and dragged to the upper layer of perforation pressure fracture to continue to fracture the upper layer by hydraulic sand-spraying perforation. After completion, the pipe column is lifted to be put ...
Подробнее