14-05-2014 дата публикации
Номер: CN103790539A
Принадлежит:
The invention provides a process of removing blocking by positive hydraulic impact and belongs to an oilfield production process. The process includes the steps of a, preparing; b, probing a sand face and diluting sand; c, performing casing pressure test; d, drifting a well; e, cleaning the casing; f, squeezing antiswelling agent, namely directly flushing the well until liquid is present at an exit, closing a casing gate, directly squeezing clay stabilizer solution, under a displacement of 400L/min, and shutting the well for 24 hours; g, performing positive hydraulic impact, namely tripping in a high-pressure string, mounting a fracturing wellhead, connecting a surface manifold, and performing pressure test, with test pressure 1-2MPa higher than construction limit pressure; after pressure test is qualified, pumping fluid from the casing into an in-well pump, controlling fluid pressure to stably rise to a reservoir fracture pressure critical point, and decreasing pumping speed; h, flowing ...
Подробнее