20-02-2008 дата публикации
Номер: CN0101125440A
Автор:
ZOU HONGWEI,
WANG QIANG,
HAN WEI,
TANG HAOXIAN,
CHEN JIE,
WANG XINLI,
QIAN JIMIN,
SUN ZUHONG,
ZHOU WENWU,
ZHONG SHIQUAN,
SHEN CHAO,
YUAN DONG,
ZHOU YUXING,
ZHONG WEIXIANG,
HONGWEI ZOU,
QIANG WANG,
WEI HAN,
HAOXIAN TANG,
JIE CHEN,
XINLI WANG,
JIMIN QIAN,
ZUHONG SUN,
WENWU ZHOU,
SHIQUAN ZHONG,
CHAO SHEN,
DONG YUAN,
YUXING ZHOU,
WEIXIANG ZHONG
Принадлежит:
The present invention discloses a monolithic prefabricated construction method of pretensioned beam, the main working procedures of which comprise: construction preparation, bottom die adjustment, guide device and lateral die installation, hoisting bottom web reinforcement, end die and steel beam installation, threading steel strand and PVC pipe, hoisting internal die and deck reinforcement, firstly pulling of steel strand, finally pulling of broken line reinforcement, finally pulling of straight line reinforcement, grider concrete packing, grider concrete maintenance, loosening internal and lateral dies, broke line extension, cutting guide device, straight line reinforcement extension, hoisting steel beam, end and internal dies removal, hoisting grider, cutting wire and sealing anchor, etc. The construction method adopts straight line and broken line reinforcements, which is able to meet the demand of prefabricated construction of bridge with 32m / 900t big span and large tonnage; at the ...
Подробнее