11-08-2023 дата публикации
Номер: CN116575753A
Принадлежит:
The invention relates to a dismantling method of an underground structure combining a piled anchor support and a main body structure, which comprises the following steps: S1, determining the position of an anchor rod according to a foundation pit design drawing, forming a hole in the position of the anchor rod out of a structural side wall as an anchor disc mounting hand hole, exposing the end of the cut anchor rod, and mounting an end anchor disc; s2, mounting a bracket and an end plate; pedestals are welded on the inner sides of the end plates; mounting an anchor disc for fixing; s3, a jack, an axial force meter and an anchor disc for tensioning are installed; s4, the tensioning force of the anchor rod during foundation pit design is determined, the jack is started, and the anchor rod is tensioned; and S5, the underground structure is removed, and the foundation pit is backfilled. Reconstruction of a supporting structure is omitted, and the method is lower in carbon and more economical ...
Подробнее