17-08-2015 дата публикации
Номер: KR1020150092865A
Принадлежит:
The present invention relates to a method for effectively managing a total production schedule by accurately predicting a production period and costs and setting a process plan in a large-scale order production system wherein various kinds of production systems are mixed to build a ship, a building, a construction structure, engineering, and a plant which are huge and complex. According to the present invention, the present invention provides a framework of layered discrete event simulation (Layered DES) and a simulation method using the same. In order to effectively manage the total production schedule by accurately predicting a production period and costs through a simulation and setting a process plan, a model, composed properly based on the kind and the amount of data, is generated in a layered and independent structure based on a modeling method based on discrete event system specification (DEVS), which is an object-oriented modeling method. Therefore, the Layered DES can flexibly ...
Подробнее